ALE has drawn on its experience in delivering tightly planned, efficient heavy lifting projects to complete the lifting of a cold box, weighing 272t (300…
Tag
superlift
-
-
One of the challenges that shipbuilders face is getting the vessel into the water once building has been completed. Sarens was asked to launch the…
-
A dozen wireless Straightpoint (SP) load cells were added to a custom-built lifting frame that utilized 12 pick points to raise a pair of non-identical…